How we work
These are the habits we bring to a programme. They come from work already done, including the lessons from a recent build with an Australian CNC manufacturer, not from a tidy theory of how AI projects should run.
Start with the real path, not the ideal one
Some systems will not let you attach a file through an API. Some ERP steps only work in a browser. If we promised a fully hands-off document flow on a system that cannot accept the files, we would be selling a result the tools cannot deliver.
We look at those limits first. Steps that cannot be reliably automated are designed as person-in-the-loop from the start, not discovered later.
Treat the network as something that will drop
Workshop and office networks fail. On the CNC programme, a keepalive, and sometimes a rebind, had to be added before the board and inventory jobs were reliable. We now treat that as a design assumption: health checks and keepalives belong in the first version, especially where jobs have to reach a private network.
Put the unglamorous basics in the first release
A leaked lock — a file descriptor left behind — once stalled an order poll until it was cleared and the helper was fixed. Lock hygiene belongs in the first version, not as a later repair.
The same applies to catch-up. Mid-run orders can be missed by a windowed daily sync unless the job catches up at the end. That catch-up should be designed in, not added after the fact.
Keep status and notes apart
Notes from different sources do not always merge cleanly. Standing order notes can be missed or overwritten if live status is written into the same field.
Notes should stay as standing customer and order information. Status belongs in pills and fields, where it can be updated safely.
Ship the front end and the supporting files together
A release path that ships the front end but not the supporting server files leaves people copying pieces by hand. We keep those on the same deploy, with a backup and a single rollback script, every time.
Review before anything goes live
Changes can be built offline. They are reviewed, and they only go live once you approve them. That keeps you in control of the boards and applications your team uses all day.
Measure from day one
Elapsed times, volumes and failure rates should be recorded from the start, so you have a clear picture of what the work is doing. A later write-up is weaker if all it has is a few good examples and no before-and-after.
We are willing to publish measured figures with their caveats, and we will not invent an hours-saved or dollar figure when we do not have one.
What a typical engagement looks like
- A conversation about the work you want to improve, and the systems you already use.
- Consulting, to map the real path, the edges, and a first scope we can stand behind.
- Implementation, in stages, with review and approval before each release.
- Support, once the first jobs are live, so health checks, keepalives and changes have a home.